THE LABORATORY / PHOTOGRAPHIC BUILD RECORD

Built, not imagined.

An unused tiled shower. A handmade timber frame. A controlled research enclosure. Five chapters, told with original construction photographs.

This series records the development of a small independent botanical research environment: from an unused tiled basement space to a proposed, instrumented observational laboratory. It is a build history, not a set of certified engineering instructions or a report of completed experimental findings.

Photographic edition · Original project images are presented without identifying metadata. The photographs document visible construction stages; precise as-built dimensions and safety certification remain unverified. Illustrative technical diagrams are labeled as reconstructions.

The five-part series

The original tiled shower before installation
● ORIGINAL BUILD PHOTOGRAPH   /   The original tiled shower before installation
The support structure inside the enclosure
● ORIGINAL BUILD PHOTOGRAPH   /   The support structure inside the enclosure

VISUAL CHRONOLOGY · Original photographs recovered from the laboratory build discussion.

Source and revision policy

We preserve the distinction between what was planned, what the founder reported completing, and what has been independently verified. A future photographic edition will use reviewed original photographs and verified as-built measurements. Corrections will be recorded rather than silently overwritten.